1 |
Construction of eight lane access controlled expressway starting near major
bridge on Chakan river to major bridge on Mej River (Ch. 309.001 - 331.030)
section of Delhi - Vadodara green field alignment (NH-148N) on EPC mode under
Bharatmala Pariyojana in the state of Rajasthan (Package 11) |
2 |
Construction of eight lane access controlled expressway starting near major
bridge on Mej river to junction with SH-37A (Ch. 331.030 - 359.170) section of
Delhi - Vadodara green field alignment (NH-148N) under Bharatmala Pariyojana in
the state of Rajasthan through an engineering, procurement and construction
(EPC) contract (Package 12). |
3 |
Construction of eight lane access-controlled expressway starting near junction
with SH-37A to junction with NH-76 (Ch. 359.170 - 388.420) section of Delhi -
Vadodara green field alignment (NH-148N) under Bharatmala Pariyojana in the
state of Rajasthan through an engineering, procurement and construction (EPC)
contract (Package 13). |
4 |
Design and construction of two (2) bridge on MR 68s (Bourke to Tilpa road)
located at 21 km and 147 km Bourke shire council Australia south west from
Bourke. |
5 |
Burrinjuck road bridge – Carrolls Creek - 3528CAR (Bridge #1), tributary to
Carrolls Creek - 3528BUR (Bridge #2), Garryowen road - 3528BIN (Bridge #3). |
6 |
Lithgow City Council - Lake Pillans Boardwalk Construction. |
7 |
Parks Victoria - Merri Creek Parklands new bridge construction (ITS2 00226)
(Bridge #1) 17034_00 Fire Access Creek crossing REVE (Bridge #2) Merrick Walk
Track_Rev F_040920. |
8 |
Design and construction of cattle underpass 37-20 Hamilton regional livestock's
exchange - Southern Grampians Shire Council, Australia. |
9 |
Warrawee Reserve, Shale Road, Latrobe high level cyclist bridge over Mersey
River & northern trail connection - Latrobe Council, Australia. |
10 |
Development of feeder routes to improve the efficiency of freight movement in
India under Bharatmala Pariyojana (Package 1/ Lot 4) DND Faridabad Ballabhgarh
bypass with Delhi Vadodara expressway near KMP interchange - 21 km Elevated
Corridor. |
11 |
Construction of 4 laning of NH-5 (Old NH-22) from Kaithlighat to Shakral village
(Package 1 from km 128.835 to km 146.300) for design length = 17.465 km in
Himachal Pradesh on HAM mode. |
12 |
Construction of Elevated Highway Corridor (6-LaneAt-Grade and6-Lane Elevated Highway) from Km.12.700 m.34.000 (Section from Pune to ShirurofNH-753F Design Length 21.30Km) in the State of Maharashtra on BOT (Toll) Mode (Package-2) under NH-O |
13 |
Up-gradation of existing 2 lanes highway to 4 lane at grade with construction of 4 lane elevated flyover (section Talegaon- Chakan Shikrapur of NH-548D (from Km. 25.000 to Km. 53.200 (design length 28.200 Km)) in the State of Maharashtra to be executed on BOT (Toll) Mode (Package-2) under NH (O). |
14 |
Up-gradation of existing 2 lanes highway to 4 lane at grade with construction of 4 lane elevated flyover (section Talegaon- Chakan Shikrapur of NH-548D (from Km. 0.000 to Km. 25.000 (design length 25.000 Km)) in the State of Maharashtra to be executed on BOT (Toll) Mode (Package-1) under NH (O) |
15 |
Rehabilitation & Re-Construction Of 2-Lane of Shimla- Mataur Section of Nh- 205 From Km 18/500 To Km 18/615 At Ghandal Landslide Location in The State Of Himachal Pradesh. |
16 |
Construction of Two-Lane High-Level Bridge across river Kali Sindh at Barod on SH 70 at Km 58 in Kota in District in the state of Rajasthan. |