1 |
Preparation of DPR for construction of flyover at junction point of convoy road with NH-37 leading to Amulapatty near Jalan bus Terminus Dibrugarh in replacement of railway level crossing (LC Gate no DD-10) for the year 2017-2018. |
Assam |
Completed |
PWD Govt. of Assam |
2 |
Construction of 6 lane elevated corridor from Mayur Vihar flyover (near Chilla regulator) to Mahamaya flyover on Noida-greater Noida expressway, along Shahdara drain. |
NOIDA |
Completed |
UPSBC |
3 |
Construction of Elevated Highway Corridor including provision for metro (Section from Hadapsar to Yavat of NH-65(from Design Km. 8.500 to Km. 40.000)) in the state of Maharashtra. |
Maharashtra |
Completed |
MSIDC |
4 |
Construction of Link Road Connecting Ship Repairing Facility to Pandu Terminal with allied works, Construction of Guest House Building at Pandu and Development of Park Area along the River Brahmaputra. |
Assam |
Ongoing |
PWD Govt. of Assam |
5 |
Preparation of Detailed Report for Construction Elevated corridor from Chilla Regulator to Mahamaya Flyover (Approximately 9.7km Aggregate Length of elevated corridor) in NOIDA, in the state of Uttar Pradesh. |
Uttar Pradesh |
Completed |
UPSBC |