| Construction of 6 lane highway in between Rajkot-Bamanbore section of NH-8A (New
NH-47) on EPC mode in the State of Gujarat. |
| Four laning of Haridwar Nagina section of NH-74 from km 0.000 (Design Chainage
km 204.300 of NH-58) to km 71.614 in the state of Uttarakhand and Uttar Pradesh
under NHDP Phase-IV on EPC Mode. |
| Construction of 4-laning of Rai Malikpur (Haryana / Rajasthan border) - Narnaul
- Mohindergarh - Charkhi Dadri - Bhiwani - Kharak corridor, section from km.
94+600 to 125+920 of NH-148B in the state of Haryana (Package-IV) on EPC mode.
|
| Construction of 4-Laning of Rai Malikpur (Haryana / Rajasthan border) - Narnaul
- Mohindergarh - Charkhi Dadri - Bhiwani - Kharak corridor, section from km.
99+000 to 114+375 of NH-709 (Extn.) and Bhiwani bypass from km. 125+920 to
135+141 of NH-148B in the state of Haryana (Package-V) on EPC mode. |
| Construction of Four laning of Haridwar Nagina section of NH-74 from km 0.000
(design chainage km 204.300 of NH-58) to km 71.614 in the state of Uttarakhand
and Uttar Pradesh under NHDP Phase-IV on EPC Mode. |
| Construction and Upgradation of existing road to 2-lane with paved shoulder of
Bagrakot-Kafer section of NH-717A from km. 0.000 to km. 13.000 on EPC basis
under SARDP-NE Phase-A in the state of West Bengal (Package-IVA). |
| Upgradation to intermediate lane of NH-301, Kargil Zanskar Road from km 98+524
to km. 117+180 in the state of Jammu & Kashmir on EPC Mode. |
| Widening / Improvement to four lane with paved shoulder from km 666+000 to
81+000 (Design chainage 65+523 to 80+930) of Dokmoka-Loringthepi section
(Section 3) of NH-29 in the State of Assam under Bharatmala Pariyojana on EPC
mode. |