Detailed Project Reports

Names of Project under Detailed Project Report Length (Km)
Consultancy services for Feasibility Study and preparation of Detailed Project Report for implementation of wildlife measures proposed on Kaziranga National Park (KNP) stretch of the NH-37. 37.00
Consultancy services for Project Management Phase-I including preparation of Detailed Project Report for upgradation of highway starting from junction with NH-40 at Kurnool connecting Nandikotkur, Atmakur and terminating at its junction with NH-765 at Dornala to two/four lane with paved shoulder configuration. 90.00
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration. (i) Kondagaon-Narayanpur (48.70 km) 48.70
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration. (i) Geedam-Dantewada (12.00 km) 12.00
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration. (i) Narayanpur-Kutul-Farasbeda-MH border (50.00 km) 50.00
Consultancy Services for Preparation of Detailed Project Report for Development of Economic Corridors, Feeder Routes and Coastal Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3/ Odisha & Jharkhand/Package-2) – For Chhattisgarh Section - 124.661km. 6 Laning. 124.661
Consultancy Services for Preparation of Detailed Project Report for Development of Economic Corridors, Feeder Routes and Coastal Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3/ Odisha & Jharkhand/Package-2) – For Odisha Section - 240.422 km. 6 Laning. 240.42
Consultancy Services for Preparation of Detailed Project Report for Development of Economic Corridors, Feeder Routes and Coastal Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3/ Odisha & Jharkhand/Package-2) – For Andhra Pradesh Section - 99 Km. 6 Laning 99.00
Consultancy Services for Preparation of Detailed Project Report for 2/4 laning of Khanabal to Baltal section on NH-501 (Ex. Length – 90 Km) with paved shoulder in the UT of Jammu and Kashmir 90.00
Consultancy services for preparation of detailed project report (DPR) including land acquisition for construction of Bari bypass in the state of Rajasthan 12.00
Consultancy Service for Preparation of Detailed Project Report (DPR) Including Land Acquisition for Construction of Bypass Road of Todabhim in the state of Rajasthan, Approximate Length 9km 09.00
Construction work for Preparation of Detail Project Report (DPR) including land Acquisition for Construction of Saipau Bypass Approx. Length 08.00 Km 08.00
Engaging Technical Consultant for Finalization of Alignment and Preparation of Feasibility Study (FS) on EPC Mode for Development of Poonch -Uri Road to NHDL Specification (Tentative length -120 Km Including 5500 Mtr. Twin Tube Tunnel) in UT of Bharatmala Pariyojna. 120.00
Project Management Consultancy services for up-gradation to 2/4 lane with paved shoulders configuration of newly declared NH 516B from its junction with NH-16 near Pendurthi connecting Kothavalasa, S. Kota and terminating at its junction with NH 516E near Bowdara in the state of Andhra Pradesh having total 40.20 kms. 40.00
Construction of Elevated Highway Corridor including provision for Metro (Section from Hadapsar to Yavat of NH-65 (From design km. 0.000 to km. 31.500)) in the state of Maharashtra 31.50

Book a Meeting

Scroll