1 |
Construction of eight lane access controlled expressway starting near major bridge on Chakan river to major bridge on Mej River (Ch. 309.001 - 331.030) section of Delhi - Vadodara green field alignment (NH-148N) on EPC mode under Bharatmala Pariyojana in the state of Rajasthan (Package 11)
|
2 |
Construction of eight lane access controlled expressway starting near major bridge on Mej river to junction with SH-37A (Ch. 331.030 - 359.170) section of Delhi - Vadodara green field alignment (NH-148N) under Bharatmala Pariyojana in the state of Rajasthan through an engineering, procurement and construction (EPC) contract (Package 12).
|
3 |
Construction of eight lane access-controlled expressway starting near junction with SH-37A to junction with NH-76 (Ch. 359.170 - 388.420) section of Delhi -Vadodara green field alignment (NH-148N) under Bharatmala Pariyojana in the state of Rajasthan through an engineering, procurement and construction (EPC) contract (Package 13).
|
4 |
Design and construction of two (2) bridge on MR 68s (Bourke to Tilpa road) located at 21 km and 147 km Bourke shire council Australia south west from Bourke.
|
5 |
Burrinjuck road bridge – Carrolls Creek - 3528CAR (Bridge #1), tributary to Carrolls Creek - 3528BUR (Bridge #2), Garryowen road - 3528BIN (Bridge #3)
|
6 |
Lithgow City Council - lake Pillans Boardwalk Construction.
|
7 |
Parks Victoria - Merri Creek Parklands new bridge construction (ITS2 00226) (Bridge #1) 17034_00 Fire Access Creek crossing REVE (Bridge #2) Merrick walk Track_Rev F_040920
|
8 |
Design and construction of cattle underpass 37-20 Hamilton regional livestock's exchange - Southern Grampians Shire Council (Australia)
|
9 |
Warrawee reserve, Shale road, Latrobe high level cyclist bridge over Mersey river & northern trail connection -Latrobe Council Australia
|
10 |
Development of feeder routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Package 1/ lot 4) DND Faridabad Ballabhgarh bypass with Delhi Vadodara expressway near KMP interchange - 21 km Elevated Corridor
|
11 |
Construction of 4 laning of NH-5 (Old NH-22) from Kaithlighat to Shakral village (Package 1 from km 128.835 to km 146.300) for design length = 17.465 km) in Himachal Pradesh on HAM mode.
|